| ESB | 110kV Framework Contract (RoI) |
Contract for the refurbishment of existing 110kV live substations throughout Ireland. Work included the removal & retirement of existing equipment and installation and pre-commissioning of new HV switchgear, transformers, etc. Powerteam provided Person in Charge of Work (PICW), approved by ESB, to supervise work adjacent to live 110kV equipment under Permit for Work conditions. Scope of work covered the following:
Projects completed included:
Kilmahud, Co. Dublin (for Microsoft plant) (2009):
Grangecastle, Co. Dublin (2009):
Adamstown (2008):
Dardistown, Dublin Airport (2008):
Gortawee, Co. Cavan (2007-2008):
|
2005-2007 (extended to 2008) |
| NIE | Carnmoney (NI) |
Refurbishment of 110kV substation, including replacing circuit breakers, disconnectors, busbars insulators and marshalling kiosk and all associated civil works. | 2007-2008 |
| NIE | Eden (NI) |
Refurbishment of 110kV substation, including replacing of circuit breakers, disconnectors, busbars insulators and marshalling kiosk and all associated civil works. | 2007-2008 |
| Scottish & Southern Energy (Scottish Hydro Electric) | St Fergus (Peterhead) |
Refurbishment of three 132kV substations and construction of one new 132kV substation.Scope of work includes:
|
2007-2008 |
| Scottish & Southern Energy (Scottish Hydro Electric) | Charleston
(Dundee)
|
Removal of two 40-year old 30MVA 132kV transformers and the replacement of 7 bulk oil 132kV circuit breakers with 9 new circuit breakers. Repositioning of transformer bays and bus-bar layouts to reduce footprint area. Powerteam responsible for electrical & civil design including equipment procurement, installation and commissioning & foundation alterations, oil containment, cable tracks plus CDM responsibility. | 2006-2007 |
| Scottish & Southern Energy (Southern Electric) | Winfrith Heath (England) |
Disposal of existing plant and equipment and the supply, installation and commissioning of replacement 132kV circuit breakers and associated plant and equipment at this 132/33kV substation plus CDM responsibility. | 2006 |
| Scottish & Southern Energy (Southern Electric) | Winchester (England) |
Disposal of existing plant and equipment and the supply, installation and commissioning of replacement 132kV circuit breakers and associated plant and equipment at this 132/33kV substation plus CDM responsibility. | 2006-2007 |
| Scottish and Southern Energy | Mossford & Quoich Hydro Electric Power Stations (Scotland) |
Scope of work covered the design, procurement, installation and commissioning of 11kV switchgear, cable replacement, supply of two auxiliary transformers and upgrade of generator and 132/11kV transformer control & protection. Powerteam also undertook related civil engineering work and Principal Contractor role under CDM regulations. | 2005 |
| Scottish and Southern Energy | Orkney Islands | Installation of capacitor banks at 33kV substation. | 2004 |
| Western Power Distribution | Landulph (England) |
Change-out of circuit breakers at 132kV substation. | 2004 & 2006 |
| ESB | Nenagh (RoI) |
Electrical fit-out of new 110kV substation. | 2005-2006 |
| ESB | Carriagadroid (ROI) |
Electrical fit-out of new 110kV Substation. | 2005-2006 |
| ESB | Sealrock
(ROI)
|
Electrical construction of new 110kV substation. | 2004 |
| ESB | Stratford, Galway (ROI) |
Electrical construction of new 110kV substation. | 2002-2004 |
| ESB | 110kV Substations (ROI) |
Installation of 110kV capacitor banks and change of transformers at:
|
2003-2004 |
| ESB | Inniscarra, Cork (ROI) |
Refurbishment and extension of 110kV substation. | 2003-2004 |
| ESB | Tonroe, Blessington (ROI) |
Electrical construction of new 110kV substation. | 2002-2003 |
110 / 132kV Substations 2008 & earlier
– December 31, 2008Posted in: 110/ 132kV Substations