| ESB | 38kV ISP1 Framework Agreement (RoI) |
Framework agreement for the refurbishment of seven 38kV substations at Baltinglass, Killybegs, Birr, Newport, Kilcock, Ballinderry and Ballyconnell.Scope of work covered civil engineering, electrical customisation, electrical installation, pre-commissioning and supply of protection equipment. | 2005-2008 |
| ESB | MV/LV Substation refurbishment (RoI) |
2-year framework contract for the installation and jointing of LV & MV cables, installation and testing of distribution substations and MV equipment maintenance. | 2006-2008 |
| Scottish & Southern Energy (Scottish Hydro Electric) | Inverawe Hydro-Electric power station (Scotland) |
Refurbishment of Inverawe Hydro-Electric power station.Scope of works covered:
|
2008 |
| Siemens | RTU (NI) |
Installation of Siemens Remote Terminal Units (RTU) for 24 NIE transmission substations. | 2007-2008 |
| ESB | Tralee (ROI) |
Upgrade of 38kV substation “cubical” type switchgear, including new protection and control systems. | 2007 |
38kV to LV Substations 2008 & earlier
– December 31, 2008Posted in: 38kV to LV Substations