Hunter’s Hill 20MW -33kV substation (NI)
Scope of works included:
- Project management, electrical design and system studies.
- Supply and installation of:
- 33kV switchboard
- Protection, control, indication & telecommunications panels
- Batter/charger unit
- Pre-insertion resistor with associated CTs for differential and overcurrent protection systems.
- Supply, installation and termination of all LV power and multicore cables.
- Testing and commissioning.