SSE Renewables (Airtricity) Dromada 70MW (Ph. 1 – 28.5MW) 110kV substation (ROI)
Scope of works included:
- Project management, electrical design and system studies.
- Civil & building works
- Supply and installation of:
- 110kV AIS switchyard and equipment for ‘tail fed’ connection
- EirGrid control building incorporating protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems; emergency diesel generator
- 70MVA grid interface transformer (free issue), neutral earthing resistor, auxiliary ‘house’ transformer and emergency diesel generator
- IPP control building incorporating 20kV switchboard for WTG feeder collection circuits; protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems.
- MV, LV and control cabling
- Substation earthing grid.
- Substation building services.
- Testing & Commissioning.