Customer |
Project Name |
Work Definition |
Year |
|---|---|---|---|
| Scottish and Southern Energy (SSE) | 11 & 33kV overhead line clearance (Scotland) |
Supply of overhead linesmen to assist SSE (Scottish-Hydro region) in rectifying ground clearance issues under the Electricity, Safety, Quality and Continuity Regulations 2002 (ESQCR.) | 2007-2008 |
| Western Power Distribution (WPD) | Fraddon (Cornwall, England) |
Construction and refurbishment of 7km of 33kV wood pole overhead line. Scope included supply of poles, fittings and 150mm2 copper conductor. | 2007 |
| Western Power Distribution (WPD) | Bodmin (Cornwall, England) |
Refurbishment of 4km of 33kV wood pole overhead line single circuit. Scope of work included the supply of poles, fittings and 150mm2 Copper conductor. | 2007 |
| Northern Ireland Electricity (NIE) | Bessie Bell Windfarm (NI) |
Uprate 12.78km of existing 33kV overhead line to Bessie Bell Windfarm | 2007 |
| Northern Ireland Electricity (NIE) | Quinns Windfarm (NI) |
Construction of 13.49km of 33kV new overhead line to Quinns Windfarm | 2007 |
| Northern Ireland Electricity (NIE) | Altnahullion Windfarm (NI) |
Construction of 8.26km of 33kV new overhead line to Altnahullion Windfarm | 2007 |
| Northern Ireland Electricity (NIE) | Lough Hill & Bin Mountain (NI) |
Construction of 8.19km of 33kV new overhead line to Lough Hill & Bin Mountain Windfarms | 2006 |
| Electricity Supply Board (ESB) | Low Voltage Refurbishment | Refurbishment of LV overhead lines and underground LV distribution system within villages on the ESB network. | 2006-2007 |
| Electricity Supply Board (ESB) | Network Refurbishment Program (RoI) |
Framework agreement for the refurbishment and upgrading of the 10kV rural overhead line system to 20kV. Work was carried out in multi locations on a simultaneous basis, with Powerteam refurbishing over 9,200km of lines during the contract. Powerteam engaged in excess of 330 staff with operational offices established in counties Donegal, Limerick, Sligo, and Cavan. | 2002-2006 |
| Electricity Supply Board (ESB) | 38kV Overhead LineRefurbishment (RoI) |
Two-year framework contract for the survey, design and re-build and uprating of 230km of existing copper Lines by new aluminium lines including the change of all poles. | 2004-2006 |
Distribution Overhead Lines – 2008 & earlier