DW Energy Screggagh 2010

Screggagh  20MW – 33kV substation  (NI)

Scope of works includes:

  • Project management, electrical design and system studies.
  • Supply and installation of:
    • 33kV switchboard; protection, control, indication & telecommunications panels; batter/charger unit; pre-insertion resistor; WF Substation SCADA system
    • 33kV power cables, fibre optic cables and copper earth conductor.
    • LV power and control cables
    • Substation & WTG earthing systems
    • Substation building services.
  • Testing & Commissioning.