Crockagarran 18MW – 33kV substation (NI)
Scope of works included:
- Project management, electrical design and system studies.
- Supply and installation of:
- 33kV switchboard; protection, control, indication & telecommunications panels; batter/charger unit; pre-insertion resistor.
- 33kV power cables, fibre optic cables and copper earth conductor.
- 6 no. WTG 2.7MVA unit transformer substations including RMU, LV CB and controls
- LV power and control cables
- Substation & WTG earthing systems
- Substation building services.
- Testing and commissioning