ESB Wind Crockagarran 2010

Crockagarran  18MW – 33kV  substation (NI)

Scope of works included:

  • Project management, electrical design and system studies.
  • Supply and installation of:
    • 33kV switchboard; protection, control, indication & telecommunications panels; batter/charger unit; pre-insertion resistor.
    • 33kV power cables, fibre optic cables and copper earth conductor.
    • 6 no. WTG 2.7MVA unit transformer substations including RMU, LV CB and controls
    • LV power and control cables
    • Substation & WTG earthing systems
    • Substation building services.
  • Testing and commissioning