SSE 33/11kV framework agreement 2008-2011

Scottish & Southern Energy (Scottish Hydro Electric)

Three-year framework agreement for the construction & refurbishment of 33/11kV substations.

Scope of work covers:

  • Procurement and installation of 33kV structures, post insulators, busbars, circuit connections, relay panels, protection panels, earth switches, floodlighting, earthing and multicore cables; earth grid installation.
  • Construction of transformer foundations, oil containment bunds, support structures, cable and earthing track excavation, access roads, fencing and substation resurfacing; electrical equipment commissioning and testing.
  • Principal Contractor responsibility under CDM regulations.
  • Protection design.
  • Provision of Senior Authorised Person (SAP) authorised to 33kV.
  • Provision of final commissioning records and drawings.

Projects On-Going:

  • Battery Point
  • Barvas
  • Cull
  • Glencoe
  • Kinlochlevin
  • Aultbea
  • Callanish
  • Pollacher