Customer |
Project Name |
Work Definition |
Year |
|---|---|---|---|
| Western Power Distribution (WPD) | Exeter AE & C Routes (England) |
132kV suspension & tension re-insulation | 2008 |
| Western Power Distribution (WPD) | Camelford K-Route (England) |
132kV suspension & tension re-insulation | 2008 |
| Northern Ireland Electricity (NIE) | Tandragee – Lisburn (NI) |
110kV portal pole changes | 2007 |
| Northern Ireland Electricity (NIE) | Ballylumford – Magherafelt (NI) |
275kV suspension & tension tower re-insulation | 2007 |
| Northern Ireland Electricity (NIE) | Ballylumford – Hannahstown (NI) |
275kV suspension & tension tower re-insulation & re-spacering | 2007 |
| Northern Ireland Electricity (NIE) | Carnmoney – Eden (NI) |
110kV earth wire re-stringing Horse with OPGW | 2007 |
| Western Power Distribution (WPD) | Hayle Ph I + II (England) |
Procurement, design and installation of foundations and erection of 1 new L4(M) DT tower with sealing end platforms adjacent to existing tower, and the dismantling and removal of a number of 132kV double circuit towers for scrap. | Ph I 2006 Ph II 2007 |
| Electricity Supply Board (ESB) | Lanesboro – Richmond (RoI) |
Construction of 24km of 110kV portal overhead line between Lanesboro and Richmond 110kV substations, consisting of both woodpole and steel towers. Scope of work included the installation and testing of all materials plus the design, procurement, installation and testing associated with the OPGW conductor. | 2006-2007 |
| Scottish and Southern Energy (SSE) | Bramley Green (Sherfield-on-Loddon, England) |
Supply and install replacement 33kV section tower. | 2006-2007 |
| Electricity Supply Board (ESB) | 2 x Sligo – Srananagh (RoI) |
Construction of 2 x (6.1km & 9.4km) of 110kV portal overhead lines between Sligo and Shrananagh 110kV substations, consisting of both woodpole and steel towers. Scope of work included the installation and testing of all materials plus the design, procurement, installation and testing associated with the OPPC conductor. | 2006-2007 |
| Western Power Distribution (WPD) | Trostre (Swansea, Wales) |
Supply and install replacement 132kV terminal tower. | 2006 |
| Electricity Supply Board (ESB) | Flagford – Srananagh (RoI) |
Laid and presented the underground/DUCT fibre cable to both substations’ transition joint kits, stringing 55 km of 1 x 48 fibre OPGW and 1km of 1 x 48 fibre OPGW plus jointing, termination and testing. | 2005 |
| Electricity Supply Board (ESB) | Auginish – Monateen (RoI) |
Re-conductoring and uprating of 8.5km of 110kV line with 430 ACSR conductor, including a 1.5km section, which was re-strung on a double circuit line with one side “live.” | 2005 |
| Electricity Supply Board (ESB) | Monateen – Limerick (RoI) |
Re-conductoring and uprating of 3km of 110kV line with 430 ACSR conductor, including a 1.5km section, which was re-strung on a double circuit line with one side “live.” | 2005 |
| Western Power Distribution (WPD) | Mountain Ash | Replacement of 132kV insulators along double circuit tower line. | 2004 |
| AMEC Group | 110kV AP1 lines Castlereagh to Newtownards (NI) |
Construction of 20km of new 110kV single pole (AP1 construction) overhead lines and terminal towers. | 2004 |
| Electricity Supply Board (ESB) | Charleville- Newmarket (RoI) |
Construction of 28km of 110kV wood pole portal construction & towers. | 2003 |