SSE Renewables (Airtricity)
90MW (Ph. 1 – 27.6MW)
-110kV substation
Slieve Kirk (NI)
Scope of works includes:
- Project management, electrical design and system studies.
- Supply and installation of:
- 110kV AIS switchyard and equipment for ‘tail fed’ connection
- 100MVA grid interface transformer (free issue), neutral earthing resistor, auxiliary ‘house’ transformer and emergency diesel generator
- 20kV, 2200A, 1.1mH reactor
- 20kV switchboard for WTG feeder collection circuits; protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems.
- 20kV power cables, fibre optic cables and copper earth conductor.
- 12 no. WTG 2.8MVA unit transformer substations including RMU, LV CB and controls
- LV power and control cables
- Substation & WTG earthing systems
- Substation building services.
- Testing & Commissioning.