Rathcahill 12.5MW -38/20kV substation (ROI)
Scope of works includes:
- Project management, electrical design and system studies.
- Substation civil & building works
- Supply and installation of:
- 38kV AIS switchyard and equipment for ‘tail fed’ connection
- 15MVA grid interface transformer (free issue), neutral earthing resistor, auxiliary ‘house’ transformer and emergency diesel generator
- 20kV switchboard; protection, control, indication & telecommunications panels; LV a.c. and d.c. auxiliary systems.
- 20kV power cables, fibre optic cables and copper earth conductor.
- LV power and control cables
- Substation earthing grid.
- Substation building services.
- Testing & Commissioning.