Athea 120MW (Ph. 1 – 52.5MW) 110kV substation ( Delayed to late 2011)
Scope of works includes:
- Project management, electrical design and system studies.
- Civil & building works
- Supply and installation of:
- 110kV 4-bay, GIS indoor switchgear and equipment
- EirGrid control building incorporating protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems; emergency diesel generator
- 120MVA grid interface transformer (free issue), neutral earthing resistor, auxiliary ‘house’ transformer and emergency diesel generator
- IPP control building incorporating 20kV switchboard for WTG feeder collection circuits; protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems.
- MV, LV and control cabling
- Substation earthing grid.
- Substation building services.
- Testing & Commissioning.