Contact
Powerteam
Sydenham Business Park
9 Heron Avenue, Belfast, BT3 9LF
Email info@powerteam.eu.com-
Latest from Powerteam ..
- IT Systems Technician
- Assistant Accountant
- P195 – Quantity Surveyor
- Transmission Overhead Project Supervisor
- P199 – Transmission Overhead Site Supervisor
- Electrical Estimator
- Trainee Project Manager
- Renewable Energy Systems – Kelburn Windfarm
- Powerteam will exhibit at Scottish Renewables 27, 28 March 2012
- Project Manager Substations GB
Project References Archive
-
Renewable Energy Systems – Kelburn Windfarm
Posted July 10, 2012 | No CommentsKelburn Windfarm Scope of works includes: Design, supply, installation, testing and commissioning of the 33kV switchgear, protection and control and... -
ESB 110kV Framework Contract 2009-2011
Posted June 6, 2011 | No CommentsContract for the new construction of 110kV substations throughout Ireland. Scope of work includes the following: Project management, including PSCS/PICW... -
SSE Renewables Slieve Kirk 2011
Posted May 15, 2011 | No CommentsSSE Renewables (Airtricity) 90MW (Ph. 1 – 27.6MW) -110kV substation Slieve Kirk (NI) Scope of works includes: Project management, electrical... -
SSE Oxford & Reading 2007-2012
Posted May 2, 2011 | No CommentsScottish & Southern Energy Framework agreement for the refurbishment of rural and urban LV ABC overhead lines in the Southern... -
Energia Renewables Corkermore Windfarm 2011
Posted May 1, 2011 | No CommentsCorkermore 10MW -38/20kV substation Scope of works includes: Project management, electrical design and system studies. Civil & building works Supply... -
ESB 110kV new line build 2009-2011
Posted May 1, 2011 | No CommentsFramework agreement for the installation of new 110kV overhead lines throughout the Republic of Ireland. Scope of work covers: Installation... -
Infinis Glenkerrie 2011
Posted April 4, 2011 | No CommentsGlenkerrie 22MW – 33kV substation (Scotland) Scope of works includes: Project management, electrical design and system studies. Supply and installation... -
SSE Framework 2007-2011
Posted April 4, 2011 | No CommentsScottish & Southern Energy (Scottish Hydro Electric) 132kV 4-year framework agreement (Scotland) 4-year framework agreement for the refurbishment of existing... -
SSE Renewables Rathcahill 2011
Posted April 3, 2011 | No CommentsRathcahill 12.5MW -38/20kV substation (ROI) Scope of works includes: Project management, electrical design and system studies. Substation civil & building... -
SSE Renewables Athea 2011
Posted April 2, 2011 | No CommentsAthea 120MW (Ph. 1 – 52.5MW) 110kV substation ( Delayed to late 2011) Scope of works includes: Project management, electrical...







Powerteam at LinkedIn
Sign up here!