PROJECT REFERENCE - SUBSTATIONS
Return to Projects
400kV substations
| Customer |
Project Name |
Work Definition |
Year |
| Siemens |
High Marnham
(England) |
Alterations to and installation of 400kV landing structures, busbars and switchgear associated with the installation of new 400kV quad booster. |
2002 |
220/ 275kV substations
| Customer |
Project Name |
Work Definition |
Year |
| ESB |
Corduff, Dublin
(ROI) |
HV electrical installation & pre-commissioning at ESB’s new 220/110kV substation. The substation comprised 20 HV bays and is the largest 220kV substation in Ireland.
We were responsible for the entire electrical equipment fit-out, covering installation of: steelwork, circuit breakers, busbars, protection panels, multicore and fibre optic cables and all pre-commissioning. Additionally we had Project Supervisor Construction Stage (PSCS) responsibility.
Over a 14-month construction period we constructed and commissioned twenty 110kV and 220kV double busbars bays; line bays; bus coupler bays; sectionalising bays and associated transformer bays. The station has a numerical substation control system (SCS) with a distributed control and protection scheme and protection schemes on both the 110kV and 220kV busbars.
At the peak of the contract 30 Powerteam staff were engaged on the project. |
2004-2005 |
| ESB |
Srananagh, Sligo
(ROI) |
Installation & pre-commissioning for the 16-bay HV electrical construction of a new 220/110kV substation including earth grids.
The substation has the capacity for two 250MVA 220/110kV transformers; 220kV & 110kV feeder bays; 220kV and 110kV coupler bays.
Our scope of work covered the entire electrical equipment fit-out with installation of steelwork, circuit breakers, busbars, protection panels, multicore and fibre optic cables, substation earthing installation and all pre-commissioning. We had responsibility as Project Supervisor Construction Stage (PSCS). |
2003-2005 |
| Siemens UK PT&D for NGT |
Elstree
(England) |
Construction of 275kV switchyard. |
2004 |
| Siemens UK PT&D for NGT |
West Thurrock
(England) |
Construction of 275kV switchyard on NGT project and diversion of overhead lines. |
20032004 |
| ESB |
Clashavoon, Cork
(ROI) |
Installation & pre-commissioning for the HV electrical construction of new 220/110kV substation including earth grids. |
2002-2003 |
110/ 132kV substations
| Customer |
Project Name |
Work Definition |
Year |
| Scottish & Southern Energy (Scottish Hydro Electric) |
132kV 5-year framework agreement
(Scotland) |
5-year framework agreement for the refurbishment of existing and construction of new 132kV substations. Work includes electrical & civil design, equipment procurement, installation, commissioning, plus all works associated with the construction of the new switchroom. Powerteam are CDM Principal Contractor.
Projects completed to date:- Millennium - Construction of new 132kV substation
- Lunanhead - Removal of existing plant and equipment and replaced with 2 new 132/33kV 90MVA transformers and associated switchgear. Responsible for civil work including construction of building to contain 33kV switchgear.
- Edenbaine - Construction of new 132kV substation
Projects on-going:
- Keith – Installation of Tx’s and switchgear (2010-11)
- Orin – New 132kV substation for WF connection (2009)
- Mossford – Replace 132kV Tx’s & prot. Mods (2009)
- Luichart – Replace 132kV Tx’s & prot. Mods (2011)
|
2007-2012 |
| Scottish & Southern Energy (Scottish Hydro Electric) |
St Fergus
(Peterhead) |
Refurbishment of three 132kV substations and construction of one new 132kV substation.
Scope of work includes:
- Final substation civil and electrical design.
- Procurement and installation of protection panels, busbars, marshalling kiosks, circuit breakers, disconnectors, landing gantry, multi coring, post insulators and chemical anchors.
- Design, supply, install and commission two 132kV cable circuits and two fibre optic cables, including sealing structures. Design and install busbar protection schemes covering all St Fergus substation sites and integrating this with SSE’s Scada system.
- Civil engineering work including equipment foundation support structures and cable trenches.
- Electrical equipment commissioning and testing.
- Earthing - design and installation of earth grids and connection of appropriate equipment.
- Principal Contractor responsibility under CDM regulations.
|
2007-2009 |
| Scottish & Southern Energy (Southern Electric) |
132kV 3-year framework agreement |
3-year framework agreement for the refurbishment of existing 132kV substations. Scope includes electrical & civil design, equipment procurement, installation, commissioning and “principal contractor” under CDM regulations.
Projects completed to date:
- Chippenham – replace fault throwers with circuit switches (2009)
- Frome – Replace switchgear (2008-09)
- Mannington – Line-bay refurb (2008-09)
- Lychett – Line-bay refurb (2008)
Projects on-going:
- Toothill – 132kV Tx replacement (2009-10)
- Wotton Common – CB replacement (2009-10)
- Neatly Common – CB replacement (2009)
- Wareham – CB replacement (2009)
(above includes associated protection mods.) |
2007-2010 |
| Scottish & Southern Energy (Scottish Hydro Electric) |
Charleston
(Dundee) |
Removal of two 40-year old 30MVA 132kV transformers and the replacement of 7 bulk oil 132kV circuit breakers with 9 new circuit breakers. Repositioning of transformer bays and bus-bar layouts to reduce footprint area. Powerteam responsible for electrical & civil design including equipment procurement, installation and commissioning & foundation alterations, oil containment, cable tracks plus CDM responsibility. |
2006-2007 |
| Scottish & Southern Energy (Southern Electric) |
Winfrith Heath
(England) |
Disposal of existing plant and equipment and the supply, installation and commissioning of replacement 132kV circuit breakers and associated plant and equipment at this 132/33kV substation plus CDM responsibility. |
2006 |
| Scottish & Southern Energy (Southern Electric) |
Winchester
(England) |
Disposal of existing plant and equipment and the supply, installation and commissioning of replacement 132kV circuit breakers and associated plant and equipment at this 132/33kV substation plus CDM responsibility. |
2006-2007 |
| Scottish and Southern Energy |
Mossford & Quoich Hydro Electric Power Stations
(Scotland) |
Scope of work covered the design, procurement, installation and commissioning of 11kV switchgear, cable replacement, supply of two auxiliary transformers and upgrade of generator and 132/11kV transformer control & protection. Powerteam also undertook related civil engineering work and Principal Contractor role under CDM regulations. |
2005 |
| Scottish and Southern Energy |
Orkney Islands |
Installation of capacitor banks at 33kV substation. |
2004 |
| Western Power Distribution |
Landulph
(England) |
Change-out of circuit breakers at 132kV substation. |
2004 & 2006 |
| NIE |
Carnmoney
(NI) |
Refurbishment of 110kV substation, including replacing circuit breakers, disconnectors, busbars insulators and marshalling kiosk and all associated civil works. |
2007-2008 |
| NIE |
Eden
(NI) |
Refurbishment of 110kV substation, including replacing of circuit breakers, disconnectors, busbars insulators and marshalling kiosk and all associated civil works. |
2007-2008 |
| ESB |
110kV Framework Contract
(RoI) |
Contract for the new construction of 110kV substations throughout Ireland.
Scope of work includes the following:
- 110kV, 38kV and 20kV outdoor bays (AIS and GIS) including erection of steelwork, busbars, circuit breakers, disconnectors, CT’s, VT’s, surge arrestors, 110kV and 38kV transformers, ASC’s, neutral earthing resistors, capacitor banks and reactors plus associated cables and protection and control systems
- 38kV indoor GIS switchboards including associated cables and protection and control systems
- 20kV indoor switchboards including associated cables and protection and control systems
- Earthing, telecoms and SCADA systems
- Building services, fire and intruder alarm systems, battery systems and auxiliary supplies.
|
2009-2010 |
| ESB |
110kV Framework Contract
(RoI) |
Contract for the refurbishment of existing 110kV live substations throughout Ireland. Work included the removal & retirement of existing equipment and installation and pre-commissioning of new ABB, Siemens, Pauwels, Schneider and Alstom equipment. Powerteam provided Person in Charge of Work (PICW), approved by ESB to supervise work adjacent to live 110kV equipment under Permit for Work conditions.
Scope of work covered the following:
- 110kV, 38kV and 20kV outdoor bays including erection of steelwork, busbars, circuit breakers, disconnectors, CT’s, VT’s, surge arrestors, 110kV and 38kV transformers, neutral earthing resistors, capacitor banks and reactors plus associated cables and protection and control systems
- 38kV indoor GIS switchboards including associated cables and protection and control systems
- 20kV indoor switchboards including associated cables and protection and control systems
- Earthing, telecoms and SCADA systems
- Building services, fire and intruder alarm systems, battery systems and auxiliary supplies.
|
2005–2007 (extended to 2008) |
| ESB |
Cherrywood, Co. Dublin
(RoI) |
Electrical fit out of new 110kV GIS substation using 110kV/MV Siemens HIS equipment. |
2010 |
| ESB |
Kildonan, Dublin
(RoI) |
Electrical installation and pre-commissioning of 110kV substation including:
- Siemens outdoor 110kV HIS switchgear consisting of 2 x 110kV line bays, 2 x 100kV transformer bays and 1 x 110kV sectionaliser Bay
- Substation control and protection system
- Building services including fire and intruder detection systems
- Pre-commissioning of the above equipment
|
2009 |
| ESB |
Grangecastle, Dublin
(RoI) |
Electrical installation and pre-commissioning of 110kV substation including:
- Siemens outdoor 110kV HIS switchgear consisting of 2 x 110kV line bays, 2 x 100kV transformer bays and 1 x 110kV sectionaliser Bay
- Substation control and protection system
- Building services including fire and intruder detection systems
- Pre-commissioning of the above equipment
|
2009 |
| ESB |
Adamstown, Dublin
(RoI) |
Electrical construction and pre-commissioning of new 110/38kV/MV substation using ABB PASS 110kV equipment. |
2008 |
| ESB |
Dardistown, Co. Dublin
(RoI) |
Electrical installation and pre-commissioning of 110/20kV substation including:
- Siemens outdoor 110kV HIS switchgear consisting of 2 x 110kV line bays, 2 x 100kV transformer bays and 1 x 110kV sectionaliser Bay
- Substation control and protection system
- Building services including fire and intruder detection systems
- Pre-commissioning of the above equipment
|
2008 |
| ESB |
Gortawee
(RoI) |
Installation of new 110/38kV transformer bay & related switchgear, including the installation of 110kV and 38kV surge arresters, 110kV neutral VT’s and 38kV changeover switch. Incorporating control cabling and protection units. |
2007-2008 |
| ESB |
Nenagh
(RoI) |
Electrical fit-out of new 110kV substation. |
2005-2006 |
| ESB |
Carriagadroid
(ROI) |
Electrical fit-out of new 110kV Substation. |
2005-2006 |
| ESB |
Sealrock
(ROI) |
Electrical construction of new 110kV substation. |
2004 |
| ESB |
Stratford, Galway
(ROI) |
Electrical construction of new 110kV substation. |
2002-2004 |
| ESB |
Tralee, Kerry
(ROI) |
Installation of 110kV capacitor banks and change of transformers. |
2003-2004 |
| ESB |
Inniscarra, Cork
(ROI) |
Refurbishment and extension of 110kV substation. |
2003-2004 |
| ESB |
Tonroe, Blessington
(ROI) |
Electrical construction of new 110kV substation. |
2002-2003 |
| ESB |
Trien, Rafenne
(ROI) |
Installation of 110kV Capacitor Banks. |
2001-2003 |
38kV to LV substations
| Customer |
Project Name |
Work Definition |
Year |
| Scottish & Southern Energy (Scottish Hydro Electric) |
33/11kV 3-year framework agreement
(Scotland) |
3-year framework agreement for the construction & refurbishment of 33/11kV substations.
Scope of work covers:
- Procurement and installation of 33kV structures, post insulators, busbars, circuit connections, relay panels, protection panels, earth switches, floodlighting, earthing and multicore cables; earth grid installation.
- Construction of transformer foundations, oil containment bunds, support structures, cable and earthing track excavation, access roads, fencing and substation resurfacing; electrical equipment commissioning and testing.
- Principal Contractor responsibility under CDM regulations.
- Protection design.
- Provision of Senior Authorised Person (SAP) authorised to 33kV.
- Provision of final commissioning records and drawings.
Projects On-Going:
- Battery Point
- Barvas
- Cull
- Glencoe
- Kinlochlevin
- Aultbea
- Callanish
- Pollacher
|
2008-2011 |
| ESB |
38kV ISP2 Framework Contract
(RoI) |
Phase II of ESB’s 38kV substation refurbishment programme including civil works, electrical customisation, electrical installation & pre-commissioning including supply of protection equipment. Powerteam awarded 9 sites to date. |
2008-2011 |
| ESB |
38kV framework agreement
(RoI) |
Framework agreement for the refurbishment of seven 38kV substations at Baltinglass, Killybegs, Birr, Newport, Kilcock, Ballinderry and Ballyconnell.
Scope of work covered civil engineering, electrical customisation, electrical installation, pre-commissioning and supply of protection equipment. |
2005-2008 |
| ESB |
MV/LV Substation refurbishment
(RoI) |
2-year framework contract for the installation and jointing of LV & MV cables, installation and testing of distribution substations and MV equipment maintenance. |
2006-2008 |
| Scottish & Southern Energy (Scottish Hydro Electric) |
Inverawe Hydro-Electric power station
(Scotland) |
Refurbishment of Inverawe Hydro-Electric power station.
Scope of works covered:
- Civil and electrical design.
- Equipment procurement and installation of 33kV isolator switch, 110V DC battery charger unit, protection panels, relays, HV and LV cabling.
- Installation and commissioning of 11kV/433V step down transformer and a brush auto synchronisation panel.
- Commissioning and testing.
- Earth grid design.
- Civil engineering works - the construction of switch house, associated cable trenching and earthing installation.
- Removal of existing terminal pole and refurbish existing “H” pole as terminal pole.
|
2008 |
| Siemens |
RTU
(NI) |
Installation of Siemens Remote Terminal Units (RTU) for 24 NIE transmission substations. |
2007-2008 |
| ESB |
Tralee
(ROI) |
Upgrade of 38kV substation “cubical” type switchgear, including new protection and control systems. |
2007 |