| Customer |
Project Name |
Work Definition |
Year |
| Dong Energy |
Walney Phase 1
183MW windfarm
132kV substation
(Heysham, UK) |
Scope of works includes:
- Project management and electrical design
- Civil & building works
- Installation of:
- 132kV GIS substation and equipment, including a reactor & filter bank, for ‘tail fed’ connection to the offshore windfarm.
- Control building incorporating protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems; tariff metering.
- LV and control cablingo Substation earthing grid.
- Substation building services.
- Testing & Commissioning.
Option: Powerteam have also secured the option to construct a similar substation for Walney Phase 2 (183MW) once Phase 1 is completed in Oct 2010. |
2010 |
| ESB Wind |
Crockagarran
18MW – 33kV
substation
(NI) |
Scope of works includes:
- Project management, electrical design and system studies.
- Supply and installation of:
- 33kV switchboard; protection, control, indication & telecommunications panels; batter/charger unit; pre-insertion resistor.
- Earthing grid and earthing for each turbine tower.
- Substation building services.
- 33kV power cables, fibre optic cables and copper earth conductor.
- Supply, installation and termination of all LV power and multicore cables.
- Sheath test all MV and LV power cables.
- Testing and commissioning
|
2009-2010 |
| Renewable Energy Systems |
Hunters Hill
20MW -33kV
substation
(NI) |
Scope of works included:
- Project management, electrical design and system studies.
- Supply and installation of:
- 33kV switchboard
- protection, control, indication & telecommunications panels
- batter/charger unit
- pre-insertion resistor with associated CT’s for differential and overcurrent protection systems.
- Supply, installation and termination of all LV power and multicore cables.
- Testing and commissioning.
|
2009 |
| SSE Renewables (Airtricity) |
Athea Phase 1
52.5MW -110kV
substation
(ROI) |
Scope of works includes:
- Project management, electrical design and system studies.
- Civil & building works
- Supply and installation of:
- 110kV 4-bay, GIS indoor switchgear and equipment
- EirGrid control building incorporating protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems; emergency diesel generator
- 120MVA grid interface transformer, neutral earthing resistor, auxiliary ‘house’ transformer and emergency diesel generator
- IPP control building incorporating 20kV switchboard for WTG feeder collection circuits; protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems.
- MV, LV and control cabling
- Substation earthing grid.
- Substation building services.
- Testing & Commissioning.
|
Delayed to 2011 |
| SSE Renewables (Airtricity) |
Dromada Phase 1
28.5MW -110kV
substation
(ROI) |
Scope of works included:
- Project management, electrical design and system studies.
- Civil & building works
- Supply and installation of:
- 110kV AIS switchyard and equipment for ‘tail fed’ connection
- EirGrid control building incorporating protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems; emergency diesel generator
- 70MVA grid interface transformer, neutral earthing resistor, auxiliary ‘house’ transformer and emergency diesel generator
- IPP control building incorporating 20kV switchboard for WTG feeder collection circuits; protection, control, indication & telecommunications panels; LV a.c. and d.c auxiliary systems.
- MV, LV and control cabling
- Substation earthing grid.
- Substation building services.
- Testing & Commissioning.
|
2009 |
| DW Energy |
Screggagh
20MW - 33kV
substation
(NI) |
Scope of works includes:
- Substation electrical design and studies.
- Supply and installation of:
- 33kV three cubicle switchboard; protection, control, indication & telecommunications panels; batter/charger unit; CT’s for PIR differential and overcurrent protection systems.
- Earthing grid and earthing around each turbine tower.
- Substation building services.
- 33kV power cables, fibre optic cables and copper earth conductor.
- Supply, installation and termination of all LV power and multicore cables.
- Sheath test all MV and LV power cables.
- Commission and test the above supplied and installed equipment.
|
2009-2010 |
| Renewable Energy Systems |
Dun Law
(Scotland) |
Design, supply, install & commission protection & control panels and battery charger |
2009 |
| Renewable Energy Systems |
Slieve Divena
18MW - 33kV
substation
(NI) |
Scope of works included:
- Electrical design of protection, control and battery charger systems.
- Supply and installation of:
- Protection panel.
- Control and Indication panels.
- Capacitor banks.
- One 48V primary and one 48V secondary battery charging unit.
- Lay 33kV cables from capacitor bank circuit breaker to capacitor bank.
- Sheath test all MV and LV power cables.
- Commission and test the above supplied and installed equipment.
|
2008 |
| Renewable Energy Systems |
Gruig
25MW - 33kV
substation
(NI) |
Scope of works included:
- Electrical design of protection, control and battery charger systems.
- Supply and installation of:
- Protection panel, control and indication panels.
- Capacitor banks.
- One 48V primary and one 48V secondary battery charging unit.
- Lay 33kV cables from capacitor bank circuit breaker to capacitor bank.
- Sheath test all MV and LV power cables.
- Commission and test the above supplied and installed equipment.
|
2008 |
| Airtricity |
Bessy Bell
9MW - 33kV
substation
(NI) |
Scope of works included:
- Electrical & protection scheme design.
- Supply and installation of:
- One 33kV switchboard.
- Six 33/.69kV step-up transformers (one per turbine.)
- Fibre optic cable from substation to the turbines.
- Battery unit.
- Protection system for electrical installation.
- Supply only 33kV cabling including jointing works (route length 3,630m).
- Commissioning and testing.
- Design and installation of earth grids and the connection of appropriate equipment.
|
2008 |
| Airtricity |
Tappaghan Ph I
19.5MW & Ph II
9 MW - 33kV
substation
(NI) |
Phase II scope of works included:
- Supply and installation of the following equipment in the existing substation:
- Extension to existing indoor 20kV switchboard comprising one WTG feeder cubicle.
- Modifications to existing protection and control panels for the new feeder.
- Additional circuits from the existing LV a.c. and d.c. panels.
- Additions to existing marshalling panels for interface with the respective SCADA systems.
- Supply, installation and termination of LV power and multicore control cabling and associated tray/ladder/trunking between 20kV switchboard extension, protection and control panels, LV a.c and d.c. distribution boards and SCADA interface panels.
- Supply and installation of:
- LV power supply, building services, telecommunications system.
- Supply in trenching/ducting 33kV power, fibre optic and earthing conductor to each of the WTG’s and radially (earth conductor only) from each WTG to reduce the earth system resistance.
- Earthing conductor at each WTG tower, earth rods and all bonding to the WTG’s, Unit Transformers and Met Mast.
- Outdoor kiosk type unit transformer substation at each WTG, including RMU, transformer and LV CB.
- LV cables between unit substation and WTG main LV switchboard board (including termination).
|
Ph I 2004
Ph II 2009 |
| SWS Natural Resources |
Owenreagh
5.1MW - 33kV
substation
(NI) |
Scope of works included:
- Electrical and protection scheme design.
- Civil engineering work covering turbine bases, upgrading of existing roads and cable trenching.
- Installation of cables, wall mounted protection panels and current transformers (CT’s), commissioning and testing.
- Design and installation of earth grids and connection of appropriate equipment.
- Project Manager responsibilities under CDM Regulations
|
2008 |
| Your Energy |
Garves
15MW - 33kV
substation
(NI) |
Scope of works included:
- Electrical design of protection, control and battery/charger systems.
- Supply and installation of:
- One control and protection panel.
- One 33kV switchboard.
- One 48V battery/charger unit.
- LV and multicore cable.
- Earthing system.
- Procurement of 33kV cables
- Sheath test all MV and LV power cables.
- Provision of building services.
- Commission and test the above supplied and installed equipment.
|
2008 |
| Renewable Energy Systems |
Altahullion
26MW
Ph I & II
33kV substation
(NI) |
Scope of work covered the design, supply and installation of the control and protection panel, procurement and installation of 33kV GIS switchboard, battery charging units and testing and commissioning of this equipment. |
Ph I 2004
Ph II 2007 |
| Renewable Energy Systems |
Wolf Bog
8.75 MW - 33kV substation
(NI) |
Scope of works included:
- Supply, install, test & commission one 33kV switchboard.
- Design, supply & installation of Dynamic-VAR reactive compensation system.
- Design, supply, install and commission two control panels.
|
2007 |
| Quinn Group |
Slieve Rushen
54 MW - 33kV
substation
(NI) |
Design, supply, install and commission 33kV containerised substation, including switchgear and control & protection system. |
2007 |
| Siemens Ireland |
Meenachullan
13MW - 38kV
substation
(ROI) |
Design, supply, install and commission new 38kV & 10kV equipment. Including construction of new control building and all related cabling. |
2007 |
| Renewable Energy Systems |
Lough Hill
12.25 MW - 33kV
substation
(NI) |
Scope of work covered the design, supply and installation of the control and protection panel, procurement and installation of 33kV GIS switchboard, battery charging units and testing and commissioning of this equipment. |
2006 |
| Renewable Energy Systems |
Callagheen
22.75 MW - 33kV
substation
(NI) |
Scope of work covered the design, supply and installation of the control and protection panel together with procurement and installation of 33kV GIS switchboard, battery charging units and testing and commissioning of this equipment. |
2006 |
| Renewable Energy Systems |
Blackhill
28.6 MW - 33kV
substation
(Scotland) |
Scope of work covered the design, supply and installation of the control and protection panel, procurement and installation of 33kV GIS switchboard, battery charging units and testing and commissioning of this equipment. |
2006 |
| Renewable Energy Systems |
Forss II
9.1 MW - 33kV
substation
(Scotland) |
Design, supply, installation and commissioning of wind farm control & protection system. |
2006 |
| Renewable Energy Systems |
Mynydd Clogau1
4.45 MW
(Wales) |
Design, supply, installation and commissioning of wind farm control & protection system. |
2005 |
| Aertech |
Black blanks
6.8 MW - 38kV
substation
(ROI) |
Design, supply, installation, commissioning and testing of 20kV wind farm control & protection system. |
2004-2005 |
| Aertech |
Snugborough
13.5 MW - 38 kV
substation
(NI) |
Design, supply, installation and commissioning of 13.5MV wind farm including all relevant civil works. |
2003 |